View Issue Details
| ID | Project | Category | View Status | Date Submitted | Last Update |
|---|---|---|---|---|---|
| 0000519 | T99X171.00 SKB Eagle | PM | public | 2019-02-27 08:57 | 2019-04-08 08:58 |
| Reporter | (ALTech) SY Yoon | Assigned To | Due Date | 2019-02-27 18:00 | |
| Priority | normal | Severity | s2-severe | Reproducibility | have not tried |
| Status | closed | Resolution | fixed | ||
| Summary | 0000519: Matrial for housing - incombustibility level | ||||
| Description | We discussed before about incombustible material. SKB doesn’t have any requirement about it. but normally SKB STB uses ABS. Please let us know the material of our housing. If you will use PC, then what is incombustibility level of material that you will use. | ||||
| Tags | No tags attached. | ||||
| Attach Tags | |||||
|
|
Please find the material details in the attached file. The flammability level is HB (UL94). However, due to we're discussing with vendor currently, the materials of housing might be changed in the future. |
|
|
|
|
|
Does the adapter of each vendor support LPS? |
|
|
this adapter is switching type. So, No LPS function. |
|
|
Does SKB require any safety accreditation on their adapters? If their adapters pass KC certification, supposedly they shall support IEC 60950. We'd like to use HB materials only on Eagle housing to prevent any cost up to SKB. However, if the adapters cannot comply with LPS, we have to use V-1(at least) materials to comply with IEC 60950 (And it will impact product unit price). Could you check whether the adapters comply with LPS again? *The below information for your reference. LPS (Limited Power Source) is defined by IEC 60950. https://www.cui.com/blog/overview-of-limited-power-source-lps-requirements There is two way to comply with LPS: 1. inherently limited power source (Maximum short circuit current of 8A / 100 VA) 2. non-inherently limited power source |
|
|
We will check again with Adaptor vendor on LPS. |
|
|
this adapter don't support LPS. but Adapter maker will test LPS and Certify next week, if they finished, they will give the report and I will update |
|
|
Hi SB, have you got the test report from vendors? Please push them to provide it because it impacts housing materials. Thank you. |
|
|
Hi Sheila. not yet. I'm waiting the report. please let me know the due date |
|
|
The due date is 3/15. Our tooling vendor is waiting for our response to confirm the housing material. |
|
|
I update LPS test report of Editech (the 1st vender of adapter). the result is pass. but the report is Korean version. I also ask the maker to english version. please review the report with Mr Philip |
|
|
I update english version (not total but the test item only) |
|
|
Hi SB, got it. Thank you. But we also need the test report from SG network because we also have to use this vendor's adapter on Eagle. Please also push this vendor to provide their report within this week. Thank you. |
|
|
Hi Sheila. SG Network's adapter pass the LPS test. the maker send me to result mail first. they will provide to the report next week (4/04) |
|
|
Hi Sheila I update SG Network's adapter LPS document. please see attached file and If you don' have any request about LPS, please close this issue |
| Date Modified | Username | Field | Change |
|---|---|---|---|
| 2019-02-27 08:57 | (ALTech) SY Yoon | New Issue | |
| 2019-02-27 08:57 | (ALTech) SY Yoon | Status | new => assigned |
| 2019-02-27 08:57 | (ALTech) SY Yoon | Assigned To | => (PM) Sheila Tu |
| 2019-02-27 10:21 | (PM) Sheila Tu | Status | assigned => feedback |
| 2019-02-27 10:21 | (PM) Sheila Tu | Note Added: 0001224 | |
| 2019-02-27 10:21 | (PM) Sheila Tu | File Added: housing_material.jpg | |
| 2019-02-27 11:05 | (PM) Sheila Tu | Note Added: 0001227 | |
| 2019-03-01 14:45 | (ALTech) SY Yoon | Assigned To | (PM) Sheila Tu => (ALTech) SB Park |
| 2019-03-02 14:13 |
|
Note Added: 0001289 | |
| 2019-03-04 18:07 | (PM) Sheila Tu | Note Added: 0001300 | |
| 2019-03-06 17:15 | (ALTech) SY Yoon | Note Added: 0001361 | |
| 2019-03-06 17:15 | (ALTech) SY Yoon | Status | feedback => assigned |
| 2019-03-07 10:18 |
|
Note Added: 0001388 | |
| 2019-03-15 15:41 | (PM) Sheila Tu | Note Added: 0001545 | |
| 2019-03-15 16:02 |
|
Note Added: 0001547 | |
| 2019-03-15 16:28 | (PM) Sheila Tu | Note Added: 0001552 | |
| 2019-03-18 15:29 |
|
File Added: 시험결과서 TYPE2541 -5V2A_LPS 시험 포함.PDF | |
| 2019-03-18 15:29 |
|
Note Added: 0001584 | |
| 2019-03-18 17:24 |
|
File Added: report_TYPE2541 -5V2A_LPS_eng.PDF | |
| 2019-03-18 17:24 |
|
Note Added: 0001586 | |
| 2019-03-19 10:07 | (PM) Sheila Tu | Note Added: 0001590 | |
| 2019-03-29 10:28 |
|
Note Added: 0001768 | |
| 2019-04-05 09:40 |
|
File Added: SGN-0502 (LPS)_20190405.pdf | |
| 2019-04-05 09:40 |
|
Note Added: 0001883 | |
| 2019-04-08 08:58 | (PM) Sheila Tu | Status | assigned => closed |
| 2019-04-08 08:58 | (PM) Sheila Tu | Resolution | open => fixed |